Machinery capability

An integrated line — from mother coil to finished product

A 1,000 m² workshop with a cutting area, raw material storage and a finished-goods staging area, laid out as an integrated line — 15 m specialized trucks can drive right in for loading.

NT metal01–02DRAWING · QUOTE IN 30H03MATERIALS04SLIT · CUT · BEND · WELD05PACKING · DELIVERY

1,000m²Production workshop

30Staff · 5 project engineers

23machinesMIG · TIG · stick welding shop

0.4–12mmBending & shearing range, 3 m wide sheet

3–6mSheet cut length

5–10tonsCrane & hoist lifting capacity

Main equipment

As listed in our capability profile

Actual equipment count

Coil-to-sheet production

Slitting machine01
3 – 6 m cut-to-length machine01
Leveling – edge-trimming machine02

Bending, shearing & lifting

3 m sheet bending & shearing machine (0.4 – 12 mm)01
5 – 10 ton overhead cranes / hoists02 / 03

Mechanical welding shop · 23 machines

3-phase MIG welder13
3-phase TIG welder · 3-phase stick welder03 · 03
Twin-rod stick welder04
  1. 01

    Receive specs and drawings

    Via form, email or Zalo — send DWG, DXF or PDF drawings or a material list.

  2. 02

    Quote within 30 hours

    With the most material-efficient cutting plan, and prime or secondary grade to suit the application.

  3. 03

    Prepare materials

    From stock, or imported to order from Japan, Korea and China.

  4. 04

    Slit · cut · bend · weld

    Slitting machine, 3 – 6 m cut-to-length machine, 3 m bending and shearing machine and a 23-machine welding shop; team leaders run each stage.

  5. 05

    Inspect, pack, deliver

    Surface-protective bundling; 15 m specialized trucks deliver to plants and project sites.

Workforce

Our direct production team

30Employees

20+Direct production workers

05Engineers in charge of projects

Production teams by function

Cutting teamFittings teamAssembly teamFinishing teamGrinding & cleaning teamPacking team

Indirect staff: administration, HR, security, accounting, import-export, warehouse.

Occupational safety

Full protective gear, regularly serviced machines

  • Helmets and protective clothing for all factory staff and workers
  • Steel-toe boots and gloves for everyone
  • In line with protective equipment rules for mechanical engineering
  • Strict, regular maintenance and inspection of machinery

Design · cost estimating

Engineers on board from the drawing stage

Design & planning

Proposing design solutions and analyses to help customers choose the optimal option.

Production design

Developing detailed component drawings for production from structural designs.

Estimating

Calculating quantities for tendering, construction, as-built records and variations.

Sales contact

Send your drawing — get a quote within 30 hours

Including the most material-efficient cutting plan · Mon – Sat: 7:30 – 17:30

Hotline · Zalo0972 425 332